At the October 5 Isabel Town Board meeting, Char Boysen reported that Hydro Klean has returned and was projected to finish the final cleaning and recording of the pipes to finalize the water project by October 6.
The town’s shop roof is in dire need of repair, and the repairs needed are beyond the resources Perry Keller and Boysen have. Trent Baumeister, an IMEG engineer, was in attendance and was …